Skip to content
Skip to content
  • Home
  • About 4 Corners
  • Client Listing
  • Contact Us
  • Projects
    • Bulk Fuel Delivery
    • Class Docking
    • Crane Installation
    • Propulsion Gear Box Overhaul
    • Remove 100t Crane, Replace with New 50t Knuckle Boom
    • RoRo Conversion and Survey
    • Suitability Survey
    • Surveys of Damages to Barge
    • Tank Renewals
  • Services
  • Whats New?

Projects

Bulk Fuel Delivery

Class Docking

Crane Installation

Remove 100t Crane, Replace with New 50t Knuckle Boom

Propulsion Gear Box Overhaul

RoRo Conversion and Survey

Suitability Survey

Surveys of Damages to Barge

Tank Renewals

 

Comments are closed.

  • Project Photos


    Bulk Fuel Delivery in Arctic 2

    Bulk Fuel Delivery in Arctic 1

    Pre purchase / Suitability Survey 2

    Pre-purchase / Suitability Survey 1

    RoRo Conversion and Survey 2

    RoRo Conversion and Survey 1

    Slinging in new crane 1

    Post Machining Thrust Face 1

    Before Machining Thrust Face 1

    Damaged Rollers on Thrust Bearing 1

    Pinion Shaft Removed 1

    After Repairs and Coating 1

    Before Repairs and Coating 1

    Class docking

    Windlass Shaft Removed for repairs 1

    PSV On Dock 1

    Damaged Barge 5

    Damaged Barge 4

    Damaged Barge 3

  • Partners and Associations

    • Member Fluid Power Society
    • Canadian Institute of Marine Engineers
    • Member of Nova Scotia Project Management Society
    • Member of the Chester Chamber of Commerce
  • Archives

  • Site Search

Copyright ©2011 4 Corners Consulting, Chester, NS B0J1J0 - Phone: 902-499-0052 - www.4cornersconsulting.ca